08.5 · Industrials, capital goods, defence, railways & EMS

Sector playbook. The capital-goods cycle is India's 2020s story: record government capex (₹12.2 lakh Cr proposed for FY27), a defence-indigenisation push with order books that run to a decade of revenue, railways capex of ₹2.9 lakh Cr, and a PLI-driven electronics manufacturing (EMS) boom. Order books are the vocabulary; execution, working capital and margins are the analysis. This is also Kaveri Pumps' home sector.

Time: ~80 min · Prerequisites: 05.4 The capital cycle, 04.4 Working capital


1. How the industry makes money

Segment Model EBITDA margin Working capital Order visibility Customer
Engineered products (pumps, motors, compressors, valves, bearings, abrasives, cables) Standard products via dealers/OEMs; some project sales 12–20% 60–100 days of NWC Short cycle; dealer restocking Fragmented industrial/agri; some government
Capital equipment (turbines, transformers, switchgear, machine tools, cranes) Engineered-to-order; project-linked 10–18% High (advances offset) Order book 1–3 years Utilities, industry, government
EPC / infrastructure (L&T-type; roads, power T&D, water, buildings) Fixed-price/lump-sum contracts; execution risk 8–12% Very high (retention, unbilled, BGs) Order book 2–4 years; book-to-bill Government, PSUs, private
Defence (aircraft, ships, missiles, electronics, ammunition) Cost-plus/nominated or competitive; long-gestation; DPSUs dominate 20–30% (DPSUs) / 10–20% (private) Customer advances make NWC low or negative for DPSUs; receivables from MoD can lag Order book 3–10 years of revenue (HAL ~₹2.5 lakh Cr — Defence Standard) Ministry of Defence; exports
Railways (wagons, coaches, locomotives, signalling, track) Tender-based; Indian Railways as near-monopsony 8–15% Moderate; payment discipline good Order book 2–4 years; budget-driven Indian Railways, metros
EMS (electronics manufacturing services — phones, TVs, appliances, wearables, PCBs) Contract manufacturing for brands; PLI-linked 3–5% (assembly) to 8–12% (components, design) Moderate; customer-funded Customer programmes; PLI targets Global and Indian brands

Government is the customer in defence, railways, T&D and most EPC — payment cycles, budget allocations and policy (indigenisation lists, PLI, ECMS) drive the sector as much as demand does (05.2 India notes).

2. The cycle as of September 2026

  • Public capex: FY27 budget capex ₹12.2 lakh Cr (IBEF); railways capex ₹2.93 lakh Cr, ~39% spent by July (Business Standard). The question for the cycle is private capex: has it followed public capex (power, cement, steel, EMS say yes; broad-based manufacturing less clearly)?
  • Defence: capital outlay ₹2.2 lakh Cr for FY27 (+22%), ₹1.39 lakh Cr for domestic procurement (KPMG); HAL's 97 additional Tejas Mk1A (₹62,000 Cr) and 156 Prachand helicopters (₹62,800 Cr); execution — engine supply from GE, delivery slippage — is the constraint, not orders.
  • EMS: Dixon and peers reached ~28% of India's smartphone assembly in FY26; the ₹40,000 Cr Electronics Components Manufacturing Scheme (ECMS) shifts the incentive from assembly to components (Techovedas). Assembly margins are thin and PLI-dependent; the value question is whether component/design capabilities arrive before PLI expires.
  • Capital-cycle warning (05.4): defence and railway stocks re-rated 3–10x in 2022–24 on order-book narratives, corrected in 2024–25, and remain priced for execution that has historically slipped. Solar-equipment capacity (modules, cells) has been added far faster than demand — the classic overshoot.

3. KPIs

KPI Definition Notes
Order book / order inflow / book-to-bill Unexecuted orders; new orders in the period; inflow ÷ revenue Book-to-bill > 1 = growing backlog; check the executable order book (some orders are framework/optional)
Order book / revenue (years of visibility) 2–4x normal for EPC; 5–10x for DPSUs — but conversion is slow
Execution / conversion rate Revenue ÷ opening order book Historical rate predicts revenue better than management guidance
Margin by contract type Fixed-price vs cost-plus; segment margins Fixed-price EPC margins fall when input costs rise mid-contract (2021–22 steel)
Working capital: NWC days, unbilled revenue, retention money, customer advances, mobilisation advances, BGs outstanding Notes; presentations The sector's cash-flow killer; Kaveri's solar receivables in miniature
CFO/EBITDA over 3 years EPC companies often show < 50%
Capacity utilisation For product companies Kaveri: pumps 78%, motors 57%
PLI / incentive income Other operating income Policy-dependent; separate from core margins
Export share Defence exports policy target; engineering exports to US/EU

4. What drives earnings and multiples

Government budget and payment discipline; private capex revival; commodity input costs (steel, copper — Kaveri's gross-margin story); policy (PLI, ECMS, indigenisation lists, Make-in-India procurement preference, "Atmanirbhar"); interest rates (financing for buyers); execution capability (skilled labour, engines, components); exports. Multiples: product companies with strong franchises (Cummins, ABB, Siemens, Polycab, Havells) 40–60x at the cycle peak; EPC 20–30x; DPSUs re-rated from 10–15x to 30–50x in 2022–24, then partially corrected; EMS 60–100x at peak on growth narratives. The sector's multiples embed cycle-peak margins and order-book conversion that the capital-cycle framework says to fade.

5. Accounting quirks

Percentage-of-completion revenue on contracts (Ind AS 115 over-time recognition): unbilled revenue/contract assets, cost-to-complete estimates that can be optimistic; retention money in receivables; customer advances as contract liabilities (negative working capital for DPSUs is customer money, not efficiency); liquidated damages provisions; warranty provisions; PLI income recognition timing; joint ventures and consortium accounting in EPC; CWIP ageing for capacity builds (Kaveri's Hosur); export incentives.

6. Red flags

Order book growing while execution rate falls; unbilled revenue and retention rising faster than revenue; margins held by capitalising costs or under-provisioning liquidated damages; working-capital borrowings funding receivables from state entities (Kaveri); order announcements that never appear in revenue; related-party subcontracting; a company "diversifying" into defence/EV/solar to catch a narrative; PLI-dependent margins presented as structural; promoter pledges rising with the stock (the 2023–24 small-cap defence/railway rally saw many).

7. How to value

Product companies: DCF with capacity/utilisation and margin drivers, cross-checked with P/E vs growth and ROCE (Kaveri's reference valuation is the template). EPC/defence: order-book conversion DCF (revenue = executable backlog × conversion + new orders × win rate), margin by contract type, explicit working-capital build, and a scenario for payment delays; P/E only with the cycle stage stated. EMS: DCF with PLI expiry and margin-mix drivers; EV/Sales sanity check against terminal margins (07.4 logic applies).

8. Representative companies (for study; verify)

Larsen & Toubro (EPC + everything), Siemens, ABB, Cummins India, Thermax, Bharat Forge, Polycab, KEI, Havells, Kirloskar Brothers, KSB (pumps — Kaveri's real peers), Grindwell, Carborundum, Timken, SKF, Schaeffler; HAL, BEL, Bharat Dynamics, Mazagon Dock, GRSE, Cochin Shipyard, Data Patterns, Solar Industries, Astra Microwave (defence); RVNL, IRCON, Titagarh Rail, Jupiter Wagons, Texmaco (railways); Dixon, Kaynes, Syrma SGS, Amber, PG Electroplast (EMS); Waaree, Premier Energies (solar equipment — capital-cycle case).

9. The 10-question sector checklist

  1. Order book: size, executable portion, ageing, and historical conversion rate?
  2. Margin by contract type, and exposure to input-cost inflation on fixed-price work?
  3. Working capital: unbilled, retention, advances, BGs, receivables from government entities — trend?
  4. CFO/EBITDA over three years?
  5. Customer: which budget line funds this, and what is the payment record?
  6. Policy dependence: PLI/ECMS/indigenisation — what happens when it changes?
  7. Capacity: utilisation, capex plans, and industry-wide capacity announcements (the capital cycle)?
  8. Execution constraints: components, engines, skilled labour, land?
  9. Governance: promoter pledges, related-party subcontracting, announcements vs delivery?
  10. What conversion rate and margin does the multiple imply, and how does that compare with history?