Why this matters: without feedback, practice only makes the habits you already have permanent. The capstone has no answer key, so the feedback has to be built. There are three layers: a rubric that scores each case file as it is written, a red-team review before any decision, and an annual review that scores your judgement against what actually happened. Only the last one grades outcomes, and it does so over enough decisions that luck starts to wash out.

Learning objectives — after this lesson you can:

  • Score a case file on the eight-criterion rubric and know what "professional" looks like on each.
  • Run a red-team review with a peer or an AI assistant, and use it to attack the case rather than to be reassured.
  • Run the annual process review: calibration, hit rates by idea type, funnel statistics, sizing discipline and the behavioural log.
  • Turn the review into one to three process changes, recorded in the casebook's PROCESS.md.

Prerequisites: 15.1–15.3, stock-pitch rubric · Time: ~45 min


1. The case-file rubric

Score each completed case file (stages 1–4) from 1 to 5 on each criterion, and multiply by the weight. The descriptors build on the pitch rubric, shifted towards the written record.

# Criterion Weight 1 — weak 3 — competent 5 — professional
1 Process followed 2 Stages skipped; no gate decisions recorded All stages present Each gate decision written down with its reason, including the ones that nearly stopped the case
2 Evidence 3 Mostly management and media Primary documents for every key number Primary documents plus primary research; each claim tagged with its evidence class (15.1 §3)
3 Business and returns 2 Adjectives ROIC history and a moat argument Incremental returns, unit economics by segment, how the moat is changing
4 Forensics and governance 2 Not run Checklist scored Checklist scored, adjustments carried into the model, RAG rating justified, escalation triggers written
5 Valuation 3 One number Scenarios and a cross-check Method suited to the business; reverse DCF; scenario tree tied to drivers; sensitivities on the one or two drivers that matter
6 Variant perception 3 None, or "it's cheap" Stated Precise, with its evidence class and the specific evidence that would refute it
7 Scoreable forecasts and breakers 3 None Thesis-breakers listed A forecast register: thresholds, dates, sources, probabilities; breakers that were acted on when they fired
8 Decision and sizing 2 No decision, or a size from nowhere Decision and size Size derived from the course rules, with overlays and liquidity checked; journal entry written before the order

Maximum 100 (weights sum to 20; ×5). 70 is the bar for acting on a case. A case below 70 is not finished, whatever the stock is doing.

Kaveri, scored (15.3):

# Criterion Score Points Why
1 Process 5 10 Gates recorded, including the partial triage failure
2 Evidence 4 12 Primary documents throughout; the scuttlebutt is thin (three checks)
3 Business 4 8 Segment economics and incremental ROIC; little on the industrial segment
4 Forensics 5 10 Scored, adjusted and carried into the weights, with escalation triggers
5 Valuation 4 12 Full tree and reverse DCF; no independent check of the terminal RONIC
6 Variant 5 15 Precise, with the refuting evidence stated
7 Forecasts 5 15 Six dated, sourced, probabilistic forecasts
8 Decision 4 8 Trigger sizing derived; liquidity left "to be checked"
Total 90

2. The red-team review

Before any decision to buy, and ideally before a decision to pass, give the case file to someone whose job is to break it. A study partner is best. An AI assistant is a useful second, if it is used for attack rather than agreement.

Protocol (60–90 minutes):

  1. Give the reviewer the case file, the model and the thesis — not your conclusion first. Ask them to write the recommendation they would make from the evidence before reading yours.
  2. Steelman the other side. The reviewer writes the strongest one-paragraph case for the opposite action. You must answer it in writing, with evidence, or concede it.
  3. Attack the three weakest numbers. Which inputs, if wrong by a plausible amount, flip the decision? Each gets a sensitivity and a source check.
  4. Check the numbers. The reviewer traces ten random numbers in the case file back to their stated sources. One error means the whole file is re-checked.
  5. Independent pre-mortem. The reviewer writes their own "it is three years later and this failed", without seeing yours. Compare the two: what did they see that you did not?
  6. Record the outcome. Add a "red-team" section to the case file listing what changed: probabilities, breakers, size, or nothing, and why.

Using an AI assistant as the red team. Useful prompts:

  • "Here is my case file. Argue for the opposite recommendation, using only evidence in the file or in public filings you can cite."
  • "List the five claims in this memo that rest on management statements rather than audited numbers."
  • "Which of my thesis-breakers could not actually be observed by the date I gave, and why?"

The rules: verify every factual claim it makes against the primary source. Treat its arguments as prompts for your own checking, not as evidence. Never let it change a probability without a reason you can state yourself.


3. The annual process review

Once a year, in a fixed week (after the annual-report season, say September), spend a day on the casebook itself. Outcomes are graded here, in aggregate, and only here.

3.1 Calibration

Pool every resolved forecast from the forecast registers. Compute the Brier score, then bucket the forecasts:

Stated probability Forecasts Came true Hit rate Reading
50–59% 12 7 58% Calibrated
60–69% 18 10 56% Slightly overconfident
70–79% 15 8 53% Overconfident
80–89% 6 5 83% Calibrated (small sample)
All 51 Brier 0.23 (always-50% = 0.25)

(Illustrative numbers.) A reading like this says the analyst's "70%" means about 55%. The fix is mechanical: shrink stated probabilities towards 50% until the buckets line up. Because Kelly sizes on those probabilities, cut the Kelly fraction too, until the record improves.

3.2 Hit rates by type of idea

Split Why it matters
By mispricing reason (neglect, complexity, forced selling, trough, misunderstanding) Shows which kind of edge you actually have
By stage-1 source (screen, reading, special-situation calendar, conversation) Shows where to spend idea-generation time
Positions against passes against kills, each measured against the Nifty 500 over the same period Tests the filters: if kills beat buys, the kill test is killing the wrong things
By forensic rating at entry (Green/Amber) Shows whether Amber cases earned their discount

With a first-year sample of a handful of positions, these are hypotheses, not conclusions. Keep the table anyway; year three is when it starts to speak.

3.3 Funnel and time

Pass rates between stages, and hours per stage, against the healthy funnel in 15.1 §2. Two warning signs: every deep dive ending in a buy, and monitoring hours falling to zero on positions that are doing well.

3.4 Sizing and behaviour

  • Sizing discipline. Did any position exceed its rule-derived size, at entry or through drift? Did any fall below its trigger conditions and stay held?
  • Breaker discipline. For every thesis-breaker that fired, what was done, and how long did it take?
  • The mood log. Read the journal's mood fields next to the outcomes. Common findings are decisions taken "irritated" or "euphoric" doing worse, and adds made after a big up day. The field exists to find these patterns (11.6).

3.5 Output: process changes

The review ends with one to three changes to PROCESS.md, each with:

  • the evidence behind it;
  • the date;
  • a test that will show next year whether it worked.

The changelog at the bottom of PROCESS.md becomes the history of how your process learned. Example:

2027-09-20. Kill-test disqualifier added: receivable days up by more than 20 in two years, with the KPI withdrawn. Evidence: two of three Amber cases with this pattern underperformed; the pattern was visible at kill test. Test: Amber cases admitted in FY28 underperform less.


4. When is the course finished?

When the capstone checklist in the module index is done: twenty kill tests, three full cases, forecasts that have started to resolve, and one process change made because a post-mortem demanded it. After that there is no course left, only the practice. The casebook is where it continues.


Key terms

Term Meaning
Case-file rubric Eight weighted criteria scoring the written case; 70 is the bar for acting
Red team A reviewer, human or AI, whose job is to break the case before a decision
Steelman The strongest version of the opposing argument
Calibration buckets Forecasts grouped by stated probability, with the hit rate compared to the probability
Process changelog Dated record in PROCESS.md of each rule change, its evidence and its test

Check your understanding

  1. Your case file scores 64 on the rubric, and the stock has risen 12% since you started. What do you do?
AnswerFinish the case. The rubric bar is about the quality of the decision, not the price. A 64 means a criterion — usually evidence, variant perception or scoreable breakers — is not good enough to act on. The price move is the market's information, not yours. Record the temptation in the journal's mood field.
  1. After a year, your 80% forecasts came true 5 times out of 6. Are you well calibrated?
AnswerPossibly, but six forecasts cannot tell you. The sampling error on 6 trials is huge; a true 60% forecaster gets 5 of 6 about 19% of the time. Keep pooling. Calibration needs dozens of forecasts per bucket before it says much, which is why every case should produce several scoreable forecasts.
  1. An AI reviewer says your company's main customer "is known to be in financial difficulty". What do you do with that?
AnswerTreat it as a lead, not evidence. Find the primary source (the customer's filings, a rating action, court records) or discard the claim. If it holds up, it goes into the case file with that source; if it cannot be traced, it goes nowhere.

Go deeper

  • Philip Tetlock and Dan Gardner, Superforecasting — calibration training and the Brier score.
  • Gary Klein, "Performing a Project Premortem", Harvard Business Review (2007).
  • Annie Duke, How to Decide — decision reviews that separate process from luck.

← Previous: 15.3 Worked example — Kaveri · Module index · Appendix: Glossary →